Health and Safety resource CD


Example Health and Safety Documentation

Example statement of competence as used for Froghall camp in 2005 (PDF)
Example statement of competence as used for Froghall camp in 2005(doc)

Example work planning document as used for Froghall camp in 2005 (PDF)
Example work planning document as used for Froghall camp in 2005 (doc)

Example BW Accepted Method Statement/Safe System of Work (PDF)
Example BW Accepted Method Statement/Safe System of Work (doc)
Used for lock clearance work at Grantham in 2001/2002

Example BW style risk assessments (xls)

Example CDM 2.3 style risk assesment (Word)
Example CDM 2.3 style risk assesment (PDF)

Example CDM 3.3 style Health and Safety Plan (Word)
Example CDM 3.3 style Health and Safety Plan (PDF)

Construction Health and Safety Plan for Leasowes Park Weir by MKP (1997)

Work plan for Aston Locks weekend by MKP (1997)

Works on the Maesbury Storm Water Weir (2003)

Construction Health and Safety Plan for Northsyke footbridge by MKP (1996)

Droitwich Junction Locks Restoration Project Plan

Ice pit clearance Health and Safety Plan (1998)

Safety assessment for woolsthorpe lock bywash by MKP